Cozy MKIV Builder's Log Book - December 1998
     | 
  
  
    | DATE  | 
    DESCRIPTION  | 
    TIME  | 
  
  
     
     | 
  
  
    | 12/5/98  | 
    
      - Begin installing ribs - flox R33 and R57 in place
 
      - Micro and 1 BID R33 and R57
 
      - Layup 4 BID sump in place on fuselage
 
      - Flox BAB bulkhead in place
 
     
     | 
    4 hrs | 
  
  
    | 12/6/98 | 
    
      - Flox DB and TTE in place
 
      - Cut access hole in strake underneath for outer bolts
 
      - Layout and begin cutting holes for fuel cap and fuel sensor in strake top
 
     
     | 
    2 hrs | 
  
  
    | 12/12/98 | 
    
      - Trim and sand previous layups and sump
 
      - Finish fuel sensor and cap holes - cut foam for sensor bottom
 
      - Fit top strake - trim ribs
 
      - Cut and fit mini-rib in front of drain hole - fit plate for drain
 
     
     | 
    5 hrs | 
  
  
    | 12/13/98 | 
    
      - Cut glass for fuel sensor/cap areas
 
      - Cut glass for rear inside top strake layup
 
      - Sand inside top strake for epoxy layer - mark ribs
 
      - Cut and fit wire mesh for fuel sump hole
 
      - Begin fitting vent and fuel injection return lines
 
     
     | 
    3 hrs | 
  
  
    | 12/19/98 | 
    
      - Lay up rest of rib 1 BID layups
 
      - Micro and glass vent lines in place
 
      - Flox and glass fuel cap and sender plate in place
 
      - Flox and glass drain plate in place in strake bottom
 
      - Layup 1 BID trailing edge strake top
 
     
     | 
    6 hrs | 
  
  
    | 12/20/98 | 
    
      - Cut glass for T-hat ribs and reinforcements and sump
 
      - Layup epoxy layer - inside top strake
 
     
     | 
    2 hrs | 
  
  
    | 12/24/98 | 
    
      - Tape inside of strake top for T-hat layups
 
     
     | 
    2 hrs | 
  
  
    | 12/25/98 | 
    
      - Flox, micro and glass 2 BID "T-hat" sections - place top striake and weigh
        down.
 
     
     | 
    3 hrs | 
  
  
    | 12/29/98 | 
    
      - Remove top strake
 
      - Trim and sand all T-Hat layups - prepare for 1 BID reinforcing layups
 
      - Begin micro and 1 BID T-Hat to ribs
 
      - Remove wood end block from spar (for positioning of strake)
 
      - Flox lip on fuselage for strake top sealing
 
     
     | 
    7 hrs | 
  
  
    | 12/31/98 | 
    
      - Sand and trim previous layups
 
      - Cut glass for rest of T-Hat reinforcing layups
 
      - Glass 1 BID T-Hat reinforcing layups
 
      - Start urethane pour foam behind TTE rib
 
      - Refill and clean epoxy pump
 
      - Cut glass for rest of top strake layups
 
     
     | 
    5 hrs | 
  
  
     | 
     | 
       |